Company
General Nile for roads and bridges
Owner
General Authority for roads and bridges
location
Alexandria - Egypt
Date
October, 2020
Description
The Arab Raml Bridge / Upper Sand Bridge project with a length of 1500 m and a width of 12 meters at an estimated cost of approximately (150) million pounds, and the project is scheduled to be completed in 2022. The project consists of (three traffic lanes 3.5 m for each direction, with a total of 24 m.
Type | Size | |
---|---|---|
Total Supplied: 88 |