Shinzo Abe axis

Company
Al-Gharabli Company for Integrated Engineering Works
EGY DRILL MISR

Owner
Engineering Authority of the Armed Forces

location
Nasr City's 10th district - cairo
Date
October, 2021

Description
The Shinzo Abe axis aims to solve the crisis of bottlenecks and provide traffic liquidity within the capital, as it connects the Nasr City area and the ring road with the Suez Road and passed through the city of hope «Ezbet Al-Haggana previously» with a length of approximately 2 km.The length of the axis reaches 8 km and extends within the city of hope with a length of 2 km and also passes the car market and its width is 37 meters.Cairo Governorate, in cooperation with the Engineering Authority, implemented 4 bridges on the path of the Shinzo Abe axis in Nasr City.The implementation work included the Shinzo axis Abi implementation of a number of pedestrian bridges and service facilities on the axis in East Cairo in the Traditional Japanese architectural style
Type
Thorma Asphaltic Plug joint
Total Supplied: 142

Owner

Company

Company

Project Gallery