Khazan Aswan Bridge

Company
The Arab Contractors

Owner
General Authority for Roads and Bridges

location
Aswan - Egypt
Date
January, 2021

Description
The Axis will be linked with the "Aswan-Cairo West" road that is being developed, which will be part of the "Alexandria/Cape Town" axis in South Africa, and its length is 5.5 kilometers, and its width is 30 meters, by 3 lanes in each direction, and the part that will rise above the Nile is 320 meters, and it will be "Mg Bridge - Suspension"
Type Size
Total Supplied: 481

Owner

Consultant

Company

Project Gallery